Order Staged Change Connection
An auto-generated type for paginating through multiple OrderStagedChanges.
Anchor to Fields with this connectionFields with this connection
- •OBJECT
An order during an active edit session with all proposed changes applied but not yet committed. When you begin editing an order with the
mutation, the system creates athat shows how theOrderwill look after your changes. The calculated order tracks the original order state and all staged modifications (added or removedobjects, quantity adjustments, discount changes, andupdates). Use the calculated order to preview the financial impact of edits before committing them with themutation.Learn more about editing existing orders.
Anchor to Possible returnsPossible returns
- Anchor to edgesedges•[Order
Staged Change Edge!]! non-null The connection between the node and its parent. Each edge contains a minimum of the edge's cursor and the node.
- Anchor to nodesnodes•[Order
Staged Change!]! non-null A list of nodes that are contained in OrderStagedChangeEdge. You can fetch data about an individual node, or you can follow the edges to fetch data about a collection of related nodes. At each node, you specify the fields that you want to retrieve.
- Anchor to pageInfopage•Page
Info Info! non-null An object that’s used to retrieve cursor information about the current page.